Final Site Review and Planning
At 12:30 in
TOUGH Wall Job & unexpected delays
What happens here
After a long day of work in hot conditions (102 degrees Fahrenheit), the site is inspected. All necessary excavation is completed, the challenging stump has been removed, and the area around the pool is properly graded to ensure water runoff away from the structure. All reusable retaining wall blocks are cleaned and stockpiled, and fresh gravel for the base is on site. The crew confirms readiness to begin actual retaining wall construction on the next scheduled workday, anticipating potential rain later in the week.
Goal: Conduct a final review of the prepared site, confirming that all excavation is complete, materials are staged, and grading is satisfactory before concluding work for the day and preparing for the next phase of construction.