Initial Site Preparation & Material Delivery

0:00
13:31
38.2K views

At 0:00 in

TOUGH Wall Job & unexpected delays

What happens here

Before commencing heavy machinery operations, protective slat tracks are meticulously laid out across the grassed area, primarily to safeguard underground irrigation lines, utility lines, and the neighboring property. Concurrently, a dump truck carrying a trailer delivers a large pile of gravel onto the driveway, which is designated for use as the new retaining wall's base material.

Goal: The team sets up protective ground coverings (slat tracks) and receives a delivery of gravel, which will serve as the base for the new retaining wall. This ensures both property protection and the availability of essential materials.

Tools and materials

  • Dump Truck with Trailer
  • Slat Tracks
  • Gravel Unspecified

What they say

Hide

all right playing for today the plane's out getting some material while we're waiting for him i'm gonna get the slat tracks back in place uh we're gonna start moving dirt behind uh behind the wall that was the existing wall so all right let's just get into the day [Music] sam's got a really good plan but not everything goes according to plan every time and today that's what happens this rock will become the new base for the retaining wall but they've got to first get it dug out before they can put this in place