Skip to main content

Remove and Transport Additional Retaining Wall Blocks

8:29
13:24
49.3K views

At 8:29 in

Precision Demolition.

What happens here

Following the main pool demolition, additional tasks involve removing old retaining wall blocks. A small team of workers manually loads these blocks into the compact track loader's bucket. The track loader then transports these blocks to the dump truck, demonstrating efficient coordination between manual labor and heavy machinery for debris removal.

Goal: Manually load extra retaining wall blocks into the track loader, which then transports them to the dump truck for disposal.

Tools and materials

  • Hydraulic Bucket/Grapple ASV Posi-Track
  • Retaining Wall Blocks

What they say

Hide

satisfied after the main pool demo gets done we still find ourselves with two loads of extra retaining wall block that the customer asked us to remove so those got to go next all right wait wait you stay out of it alex all right it's between tim and i all right tell me when your room one two three go [Music] so but on every job there always seems to be extras and this customer has a few of them of their own

Auto-generated from the video audio.