Demolish and Stage Concrete within Pool Basin
2:45
13:24
49.3K views
At 2:45 in
Precision Demolition.
What happens here
After removing the perimeter concrete, the operator proceeds to demolish the concrete pool basin itself. The grapple is used to break up the pool's bottom and sides into manageable pieces. These broken concrete pieces are then stacked within the empty pool basin, creating a safe working platform. This platform allows the operator to access and remove further debris from the pool walls and floor efficiently.
Goal: Break up the concrete pool basin and walls, stacking the debris within the pool to create a stable working area.