Skip to main content

Demolish and Stage Concrete within Pool Basin

2:45
13:24
49.3K views

At 2:45 in

Precision Demolition.

What happens here

After removing the perimeter concrete, the operator proceeds to demolish the concrete pool basin itself. The grapple is used to break up the pool's bottom and sides into manageable pieces. These broken concrete pieces are then stacked within the empty pool basin, creating a safe working platform. This platform allows the operator to access and remove further debris from the pool walls and floor efficiently.

Goal: Break up the concrete pool basin and walls, stacking the debris within the pool to create a stable working area.

What they say

Hide

want it to do [Music] all right [Music] by filling in that pool bottom it gives us a safe working platform to get at the rest of the debris that has to go out [Applause] [Music] [Applause] [Music] [Applause] [Music]

Auto-generated from the video audio.