Skip to main content

Process and Stack Remaining Concrete for Recycling

5:15
13:24
49.3K views

At 5:15 in

Precision Demolition.

What happens here

Back in the pool area, the remaining concrete pieces are processed and stacked. The operator ensures that concrete chunks are broken down to an optimal size—neither too large (to avoid getting stuck in the dump truck) nor too small (to avoid being cumbersome and time-consuming to handle). These pieces are neatly stacked like 'pancakes' to allow for quick and efficient loading when the next dump truck arrives. The narrator emphasizes the importance of sorting out any non-concrete debris like metals for proper recycling.

Goal: Break concrete into optimal sizes, stack neatly, and sort out non-concrete debris for efficient recycling and loading.

What they say

Hide

[Applause] so the rest of the concrete surrounding the swimming pool doesn't need any special care or attention but really we don't change how we do it anyway [Music] we recycle the concrete but to do that means we can't mix it with anything else so any garbage debris even metals have to be sorted and separated [Applause] when we go to drop off the concrete if the chunks are too big they can get stuck and hung up in the truck but if they're too small they're just annoying to handle and take longer to deal with so we want to break them down into just the right size pieces and then stack them neatly like flapjacks so when the truck shows up we can load it [Applause] [Music] quicker with no retaining walls in the background to worry about tim doesn't have to be quite as careful when he's handling the side part [Music] so [Music] we always keep the dump truck hauling both ways for every concrete load that

Auto-generated from the video audio.