Route Cable Through Basement to Main Panel
0:35
1:02
161.8K views
At 0:35 in
Day in the Life of an Electrician⚡️ #hendythesparky Running Service Entrance Cable #electrician
What happens here
Once the 100 amp SER cable enters the basement, it needs to be routed from its entry point through the interior space to the main electrical panel. This involves navigating the cable through the basement's drop ceiling. The electrician works with a second individual (identified as his master electrician dad) to pull and guide the thick, heavy cable through the overhead spaces, ensuring it follows an appropriate and compliant path.
Goal: Successfully bring the SER cable from the entry point to the main electrical panel for connection.
Tools and materials
- Fish Tape — Pulling cable through enclosed spaces
- Ladder Werner — Accessing the basement ceiling for cable routing
- Voltage Tester — Verifying de-energized circuits before working on electrical panels
- 100 Amp SER Cable — The main electrical feeder for the subpanel
What they say
(573 characters)Hide
What they say
(573 characters)Auto-generated from the video audio.