Prepare for Subpanel Installation

0:00
1:02
161.8K views

At 0:00 in

Day in the Life of an Electrician⚡️ #hendythesparky Running Service Entrance Cable #electrician

What happens here

The electrician begins the day by getting ready for work, which includes putting on Timberland work shoes for comfort and safety on the job site. They then proceed to load a Milwaukee Packout box with the necessary tools and materials into their work van. The specific task for the day is introduced as installing a 100 amp subpanel for a detached garage, which requires running a 100 amp SER cable, noting its rating for outdoor installation.

Goal: Gather and organize tools and materials for the subpanel installation.

Tools and materials

  • Milwaukee Packout Box Milwaukee — Transporting and organizing tools and materials
  • Timberland Work Shoes Timberland — Personal protective equipment for safety and comfort on the job site
  • 100 Amp SER Cable — Providing electrical service to the new subpanel. (Mentioned as the primary material for the project)

What they say

Hide

Okay, day in the life of a 24-y old electrician. So, first thing I do is I wake up, put in my Timberland work shoes. These are great and lightweight. I mainly do residential electric, so these are perfect. I go to my van, get my materials. Today, we're installing a sub panel for a detach garage. So, we are running 100 amp STR cable, which is rated for outdoor installation. I ended up using my drill and made a hole from the outside into the customer's basement, as their main electrical panel was located there, and that was our