Prepare Cable for Future Connection and Clean Up
0:51
1:02
161.8K views
At 0:51 in
Day in the Life of an Electrician⚡️ #hendythesparky Running Service Entrance Cable #electrician
What happens here
After successfully routing the thick 100 amp SER cable to the main electrical panel, the electrician proceeds to manage the excess length. This involves coiling the cable neatly and tucking it away, ensuring it is out of the way but still accessible for future connection to the main panel. The task for the day, which primarily involved running the cable, is now complete. The electrician then packs up the tools in the Milwaukee Packout box, performs a quick check of the work, and concludes the job by leaving the site.
Goal: Securely stage the cable for final connection and complete job site cleanup.