What happens here

After successfully routing the thick 100 amp SER cable to the main electrical panel, the electrician proceeds to manage the excess length. This involves coiling the cable neatly and tucking it away, ensuring it is out of the way but still accessible for future connection to the main panel. The task for the day, which primarily involved running the cable, is now complete. The electrician then packs up the tools in the Milwaukee Packout box, performs a quick check of the work, and concludes the job by leaving the site.

Goal: Securely stage the cable for final connection and complete job site cleanup.

Tools and materials

  • Milwaukee Packout Box Milwaukee — Packing up tools after the job is complete

What they say

Hide

hand. Once we got the wire ran to the panel, I ended up just curling it and tucking it away because it was getting late. Most of our time was used to run the wire cuz man, that wire is thick. It's like an anaconda. I get off my ladder, check my work, do a little celebration dance. I put my tools away and that's what a day in the life of electrician looks like.