What happens here
Before running any cable, the electrician first identifies the customer's main electrical panel in the basement to determine the starting point for the new subpanel feed. To get the 100 amp SER cable into the basement, a hole is drilled through the exterior wall. A drill with a long drill bit is used to create a clean entry point from the outside, carefully aiming it to avoid any existing structures or utilities.
Goal: Establish a path for the electrical cable and create an entry point into the basement.
Tools and materials
- Drill — Drilling a hole through the exterior wall
- Long Drill Bit — Creating the hole through the thick exterior wall
- Voltage Tester — Verifying that electrical circuits are de-energized