Site Assessment and Initial Trench Excavation
0:08
15:05
9.5K views
At 0:08 in
Caught in a Jam! Job site crisis
What happens here
The project starts with an overview of the house and driveway, identifying the areas where a retaining wall and French drain are needed. Initial trenches are dug, primarily involving manual labor with shovels to define the path for the wall and drainage system. This stage establishes the groundwork for the subsequent construction.
Goal: Begin by assessing the area for drainage needs and then excavate the initial trenches along the driveway and house foundation where the retaining wall and French drain will be installed.
Tools and materials
- Mini-Excavator
- Shovels
What they say
(1,422 characters)Hide
What they say
(1,422 characters)Auto-generated from the video audio.