After the retaining wall is partially or fully constructed, a perforated pipe is laid in the trench directly behind the wall. This pipe forms the core of the French drain system, designed to collect subsurface water. Once the pipe is in place, the trench is backfilled with gravel, which allows water to easily seep into the perforated pipe while preventing soil from clogging the system. The mini-excavator is used to efficiently move and distribute the gravel.

Goal: Install the perforated pipe for the French drain behind the retaining wall and backfill with gravel to facilitate water collection.

Tools and materials

  • Mini-Excavator
  • Perforated Pipe
  • Shovels
  • Gravel

What they say

Hide

this day see you tomorrow good midafternoon everybody you're going to have to use your little bit of imagination uh imagination imagination you're going to have to use a little bit of your imagination uh we got two courses up here we got built up over there most of the back filling done um up to height holy crap I'm tired today Zach what the heck all right uh plan for the rest of the day is uh same as it has been building and back filling same as we do every day brain yay good morning everybody it is a chilly what it's October now right chilly October morning um so yesterday was kind of weird we didn't really get too much footage it was a lot of standing and figuring and all that stuff uh we ended up knocking this wall down like three courses cuz it was getting a little ridiculous um definitely didn't need to go as high as we initially thought which is cool cuz this looks a lot better than it was uh what it was going to so plan for today we're going to get this one done we're almost at the end [Music] [Applause] [Music] [Applause] [Music] [Applause] [Music] all right post lunch update post lunch update we got we got this side all built up minus the Caps obviously we'll probably start working on those uh Monday or Tuesday so I'm going to get this all back filled and buttoned up as best as we can right now without having the cap sign we got this bit here roughly marked out it's going to be weird on that corner and it's going to be weird on this radius we just going to kind of have to figure it out as we go which I don't mind so Bruce is going to start Excavating Along on that and Zach's going to bounce back and forth as uh as we need [Music] a [Music]