Retaining Wall Base Preparation
2:36
15:05
9.5K views
At 2:36 in
Caught in a Jam! Job site crisis
What happens here
Once the initial trenches are excavated, a layer of gravel is laid at the bottom of the trench. This gravel base is then thoroughly compacted using a plate compactor to ensure a solid and level foundation for the retaining wall blocks. This step is critical for the long-term stability and integrity of the wall.
Goal: Prepare a stable base for the retaining wall by laying and compacting a layer of gravel within the excavated trench.
Tools and materials
- Leveling Tool
- Plate Compactor
- Gravel