Lay the First Courses with Precision

9:19
22:28
166.2K views

At 9:19 in

What 99% of People Don't know about retaining walls. #diy

What happens here

Dedicate one person as the 'baser' to ensure consistency and precision in the initial block courses. The baser uses two different levels: a short level (around 2 feet) to ensure each individual block is perfectly level from side-to-side and front-to-back, and a longer level (4 feet or more) to check the level across multiple blocks, ensuring they marry together as one solid piece. This meticulous leveling in the initial stages is crucial for the overall success and longevity of the wall.

Goal: Install the foundational layers of blocks perfectly level and aligned.

Tools and materials

  • Long Level — Leveling across multiple blocks to ensure uniform height and alignment
  • Retaining Wall Blocks — The primary building material for the wall
  • Rubber Mallet — Making minor adjustments to block placement without damaging them
  • Short Level — Leveling individual blocks (side-to-side and front-to-back)