Final Touches and Professional Standards
20:30
22:28
166.2K views
At 20:30 in
What 99% of People Don't know about retaining walls. #diy
What happens here
Ensure your project has a professional and finished appearance. For curved walls, especially with units like Versa-Lok, all capstones should be cut to fit the curve precisely, avoiding gaps or unfinished edges. This meticulous attention to detail elevates the aesthetic. Avoid common contractor shortcuts, such as leaving caps uncut or failing to properly prepare the base or drainage. Going 'above and beyond' the bare minimum requirements in construction, including using at least 12 inches of drainage aggregate behind the wall (with 2-3 feet being ideal), ensures longevity and a superior final product.
Goal: Achieve a professional and durable finish for the retaining wall.
Tools and materials
- Concrete Saw — Cutting capstones to fit curves
- Retaining Wall Capstones Versa-Lok — Finishing the top of the retaining wall
- Drainage Aggregate — Backfilling behind the wall for proper drainage