Prepare the Wall Base
At 0:36 in
Retaining walls- SPOTTING short cuts & BAD work
What happens here
Begin by excavating the existing soil, removing any old timbers that may have landscape spikes (which can be dangerous due to their potential to spring back when struck). Continue excavating until you reach virgin, undisturbed soil, or solid compacted material. In areas where excavation has gone too deep or the existing soil quality is poor, introduce Class 5 gravel or other suitable base material. This base material should be spread in shallow layers and thoroughly compacted using a plate compactor to create a solid and level foundation for the first course of retaining wall blocks. Ensure any excavated material, old pipes, or tree roots are entirely removed from beneath the intended wall base.
Goal: Excavate the site to virgin, compacted soil and establish a stable sub-base for the retaining wall blocks, ensuring proper drainage and a level foundation.
Tools and materials
- Blue Tarps
- Gloves
- Mini Excavator (Bobcat 325)
- Plate Compactor
- Reciprocating Saw (Milwaukee Sawzall)
- Safety Glasses
- Shovels and Rakes
- Skid Steer (Kubota SVL65)
What they say
(2,500 characters)Hide
What they say
(2,500 characters)Auto-generated from the video audio.