Lay the First Course of Blocks
At 6:42 in
Retaining walls- SPOTTING short cuts & BAD work
What happens here
The first course of blocks is the most critical for the entire wall's stability and appearance. Each block must be individually leveled front-to-back and side-to-side. Use a level (e.g., a spirit level) and a rubber mallet to gently tap and adjust each block until it's perfectly flat. The blocks should be placed side-by-side, creating a continuous, level foundation. This step is often performed by a 'master baser' who has experience in achieving precise leveling. Work in sections if the job site is too tight for continuous construction, ensuring each section seamlessly integrates with the next.
Goal: Carefully lay the first course of retaining wall blocks on the prepared and compacted base, ensuring each block is perfectly level and aligned.
Tools and materials
- Rake
- Rubber Mallet
- Shovel
- Spirit Level
- Retaining Wall Blocks (e.g
- Versa-Lok Standard Units)
What they say
(1,271 characters)Hide
What they say
(1,271 characters)Auto-generated from the video audio.