Prepare and Compact the Wall Base
At 2:38 in
Retaining walls- SPOTTING short cuts & BAD work
What happens here
Once the old materials are removed, prepare the trench for the new retaining wall's base. The base must be laid on solid, compacted soil, free from old timbers, piping, or tree roots. If over-excavation occurs, backfill with a suitable base material like crushed rock (Class 5 aggregate is a good option if readily available) and compact it thoroughly. Use a plate compactor to achieve optimal compaction, making sure the base material is evenly spread and firmly pressed into place. This process ensures a robust and stable foundation for the entire retaining wall. Deepening and widening the base is acceptable, provided it is properly compacted layer by layer. If poor soils are present, geo-grid can be layered into the base material for additional reinforcement (though not required in this specific case).
Goal: Create a stable, level, and well-compacted base for the retaining wall using crushed rock or Class 5 aggregate, ensuring it's laid on virgin or properly compacted soil.
Tools and materials
- Plate Compactor (Wacker Neuson VP1550AW)
- Rake
- Shovel
- Skid Steer Loader (Kubota SVL65)
- Crushed Rock / Class 5 Aggregate
What they say
(1,213 characters)Hide
What they say
(1,213 characters)Auto-generated from the video audio.