Lay and Secure Retaining Wall Blocks
At 6:42 in
Retaining walls- SPOTTING short cuts & BAD work
What happens here
Place the first course of retaining wall blocks directly onto the prepared and compacted base. Use a level to ensure each block is perfectly level front-to-back and side-to-side. Continuously check the alignment of the blocks along the entire course. Once the first course is established, begin laying subsequent courses, interlocking them with the previous layer as per the manufacturer's specifications. After placing a section of blocks, drive robust landscape spikes (e.g., 18-inch rebar or similar heavy-duty spikes) through the pre-cast holes in the blocks using a large hammer or sledgehammer. Ensure the spikes penetrate deeply into the lower courses and the compacted base material, securing the layers together and preventing lateral movement. This process creates a strong, unified structure. Periodically, backfill behind the laid blocks with drainage aggregate (such as 3/4-inch angular rock) to provide further stability and allow water to drain away from the wall.
Goal: Carefully lay each course of retaining wall blocks, ensuring they are level and aligned, then drive landscape spikes through them to create strong inter-layer connections.
Tools and materials
- Large Hammer / Sledgehammer
- Level (2ft or 4ft)
- Plate Compactor
- Safety Glasses and Gloves
- Shovels and Rakes
- String Line