Lay Subsequent Courses and Secure with Pins

10:07
14:50
69K views

At 10:07 in

Retaining walls- SPOTTING short cuts & BAD work

What happens here

For each subsequent course, blocks are laid with an offset (staggered) pattern from the previous course to create strong interlocking. After placing a row of blocks, pins or rebar are inserted through pre-drilled holes in the blocks and hammered down into the blocks below, effectively joining the layers. The video shows pins (often made of fiberglass or steel) being driven through the blocks. For hollow blocks, it is crucial to core-fill them with 3/4 inch angular rock or concrete to provide solid mass and prevent the blocks from shifting or collapsing under pressure. This core filling also helps to lock the pins in place and integrate the block layers. Ensure proper compaction of backfill behind each course as the wall rises. The operator of the mini-excavator carefully places blocks onto the top of the wall while the crew positions and secures them.

Goal: Continue stacking block courses, offsetting each row, and securing the layers together using specialized pins or rebar driven through the blocks.

Tools and materials

  • Bobcat Mini-Excavator (Bobcat 325)
  • Hammer (Sledgehammer/Rubber Mallet)
  • Pins / Rebar
  • Retaining Wall Blocks
  • Shovel/Rake
  • Spirit Level
  • 3/4 inch Angular Rock (or Concrete)

What they say

Hide

you are going to go with a more hollow block i prefer having something that's hollow all the way through so that you can core fill [Music]

Auto-generated from the video audio.