Install Drainage and Backfill Lower Layers
At 8:50 in
Retaining walls- SPOTTING short cuts & BAD work
What happens here
Once the initial course (or courses) of blocks is in place, position a perforated drain pipe (e.g., corrugated pipe with sock) along the back of the wall, ensuring it has a slight slope for water to drain away. This pipe will collect water that seeps through the backfill. Backfill the area directly behind the blocks with drainage aggregate (e.g., washed rock) to allow water to easily flow towards the drain pipe. A geo-textile fabric (e.g., non-woven fabric) is then placed over the drainage aggregate and against the excavated bank to prevent soil migration into the drainage layer, while allowing water to pass through. This setup is crucial for preventing hydrostatic pressure buildup behind the wall, which can lead to wall failure. The mini-excavator can be used to carefully place larger amounts of drainage aggregate.
Goal: After laying the first course, install a perforated drain pipe behind the blocks and backfill with drainage aggregate, covering it with geo-textile fabric.
Tools and materials
- Bobcat Mini-Excavator (Bobcat 325)
- Perforated Drain Pipe (with sock)
- Shovel
- Drainage Aggregate (e.g
- Washed Rock)
- Geo-textile Fabric
What they say
(626 characters)Hide
What they say
(626 characters)Auto-generated from the video audio.