Skip to main content

Prepare Bedding Layer with Screeded Sand

9:50
15:29
56.8K views

At 9:50 in

Paver patio. Start to Finish with Instructions and Tips

What happens here

With the base material roughly spread, screed rails are laid down to guide the precise leveling of the sand bedding layer. The recycled Class 5 aggregate is compacted using a plate compactor (Tomahawk). The presenter explains that this material is 100% permeable and packs very tightly, providing a stable foundation. A uniform layer of bedding sand is then spread over the compacted base material, and a wooden screed board is used to create a perfectly level 1-inch thick sand bed. It is critical not to walk on the screeded sand to maintain its uniform level.

Goal: Compacts the base material, installs screed rails, and precisely levels a 1-inch sand bedding layer.

Tools and materials

  • Rake/Shovel
  • Bedding Sand

What they say

Hide

shortages now on the next video i'm doing a lot of talk in this one guys because i want to just fill you guys up with as much information as possible so we're going to do this this square part of the under part of this patio start to finish and then on the next one i'm gonna shut up and we're gonna walk you through all of these steps without interruption without anything it's just gonna be go go go go [Music] this material right here that we're shoveling out is recycled class five and what they've done is they've taken concrete ground it up and then it's got the fines and everything in it yeah i mean we'll find sometimes asphalt chunks or maybe even little pieces of glass in it or you know it's rebar metal steel but it packs so tight it's called again recycled class five and it's also permeable and so it doesn't look permeable but it is a hundred percent permeable don't ask me the physics of it i just know that it is permeable it's been specked on drain tile jobs massive projects that we've undertaken so we feel real comfortable putting it under a patio knowing that it will allow the water to drain through it and it hit that sub base and that sub base is what shedding so that's our shed layer remember so i want to stress we've got the sub base like this we've got our recycle class five perfectly level and then our one inch of sand is perfectly level but we do put just a tiny bit of a a kick just a tiny bit of a grain on top of that paper patio so that as water hits it that will shed as well now here we use the click and drop method and that's we don't just set the

Auto-generated from the video audio.