Deliver and Spread Base Material

8:24
15:29
56.8K views

At 8:24 in

Paver patio. Start to Finish with Instructions and Tips

What happens here

Pallets of Willow Creek pavers are delivered to the site via a flatbed truck, and an ASV skid steer is used to unload them. The team then uses the skid steer to deliver and spread recycled class 5 aggregate (crushed concrete and asphalt) as the base material over the excavated area. This material is chosen for its excellent compaction properties and permeability, allowing water to drain through it. The skid steer is used to initially level the material, with a focus on establishing the correct rough grade. The presenter highlights the importance of using high-quality, consistent pavers like Willow Creek for durability and ease of installation, noting current supply chain challenges.

Goal: Transport and distribute the recycled class 5 aggregate base material evenly across the prepared sub-base, ensuring proper depth and preliminary grading.

Tools and materials

  • Shovels
  • Skid Steer (ASV RT-75)
  • Recycled Class 5 Aggregate
  • Willow Creek Pavers

What they say

Hide

taken all the necessary precautions and then that can lead to future settlement so if you have questionable soils don't feel don't hesitate to put down some filter fabric over your sub base material to separate your base from your sub base and i know that's a lot of information but i hope that's clear [Music] now the papers that we use on this project and we've always used for the last 20 plus years or willow creek and the reason we use them as they've always delivered consistent reliable dependable products we've never had an issue once with any willow creek product period so if it ain't broke don't fix it but part of the problem is a lot of you guys are watching my videos and you're starting to order the versa lock standard unit retaining walls and you're starting to order the willow creek pavers and these guys are starting to run out so for our jobs this year we've had to actually it's right now it's uh september we've had to order all of the materials for our our entire year just to assure that we'll have materials for our projects because they are legitimately running out of products this year and a lot of places are also experiencing shortages construction shortages now on the next video i'm doing a lot of talk in this one guys because i want to just fill you guys up with as much information as possible so we're going to do this this square part of the under part of this patio start to finish and then on the next one i'm gonna shut up and we're gonna walk you through all of these steps without interruption without anything it's just gonna be go go go go

Auto-generated from the video audio.