Final Paver Compaction and Joint Sanding
At 12:17 in
Paver patio. Start to Finish with Instructions and Tips
What happens here
Once all pavers are laid, the entire patio surface is compacted again with a vibratory plate compactor, typically using a rubber mat. This final compaction settles the pavers into the sand bed and ensures a perfectly flat surface. Sand is then swept across the patio, filling the joints between the pavers. The presenter discusses his preference for regular sand over polymeric sand. He argues that while polymeric sand creates a harder, sealed joint, it eventually fails (typically within 3-5 years) and is much harder to remove and replace due to its solidified nature. Regular sand, though requiring more maintenance (sweeping and refilling every 1-2 years), is easier to maintain and replace. The goal of this step is to lock the pavers together and provide stability.
Goal: After laying all pavers, a final compaction is performed, followed by sweeping sand into the paver joints to lock them in place.
Tools and materials
- Broom
- Leaf Blower (optional)
- Rubber Mat (for compactor)
- Vibratory Plate Compactor (Tomahawk)
- Regular Sand
What they say
(2,498 characters)Hide
What they say
(2,498 characters)Auto-generated from the video audio.