Determine Sub-base Depth and Pitch

2:17
15:29
56.8K views

At 2:17 in

Paver patio. Start to Finish with Instructions and Tips

What happens here

Before any excavation, it's crucial to determine the correct depth for the sub-base and ensure a proper pitch for drainage. The presenter explains that the sub-base should not be flat but angled to allow water to drain away from the house. The total excavation depth is calculated by adding the height of the pavers, 1 inch for the sand bedding layer (not more), and 6 inches for the base material. The sub-base, which is the soil below the base material, must also be pitched for proper drainage to prevent water from getting trapped under the patio.

Goal: Calculates the necessary excavation depth and emphasizes the importance of a sloped sub-base for effective water drainage.

Tools and materials

  • Measuring Tape

What they say

Hide

to lock them in again blank came up with a little bit all right so let's go actually a little bit deeper than what sam was saying with the pet when we put a patio around deck footings the deck footings can move separately than the patio see the whole patio is designed to act as one giant thing right but the deck footings are not locked into the patio and so when you put a patio around deck footings if those deck footings experience any differential ground movement freeze thaw cycles anything that makes them move up and down the pavers around your patio can buckle so they'll show that flex going on now if it's a concrete patio it's going to crack and break if it's a paver patio it's going to look ugly okay and so since we just don't want that to be a noticeable thing a trip hazard or anything like that just by moving that patio away from the pavers where there's really no benefit i mean because the little bit of extra space isn't going to be you're not going to it's not going to be usable for anything we decided to move the paver patio in that way the the deck footings can act as their separate unit and then the entire deck can act as its own separate thing i hope that makes sense more of the square and then we got a radius coming out here so we'll have decent you know usable space under the deck and then a whole bunch of usable space out here um they went for it so that's how we're going to be doing it look at six inches of rock in there i just don't want to pack the rock on this i'll leave dirt on top of it just to give it some cushion and then we'll put in maybe six inches of the rock and we'll be up a couple interesting right now we're on the top of those pipe right there is that the top here you're 14 14 inches down so that gives you almost 5 inches of plus six of class five

Auto-generated from the video audio.