Skip to main content

Compact Pavers and Install Edge Restraints

12:52
15:29
56.8K views

At 12:52 in

Paver patio. Start to Finish with Instructions and Tips

What happens here

Once the pavers are laid, a plate compactor equipped with a rubber mat is used to settle them into the sand bedding layer. The rubber mat protects the paver surface from chips or scratches during compaction. This process ensures that the pavers are firmly seated, creating a stable and level patio surface. Afterward, a plastic snap edging is installed around the perimeter of the patio and secured with steel stakes. This edging prevents the pavers from shifting laterally and maintains the patio's shape.

Goal: Compacts the laid pavers to set them into the sand bed and secures the patio perimeter with snap edging.

Tools and materials

  • Hammer
  • Plastic Snap Edging
  • Steel Stakes

What they say

Hide

outline a paver course with steel stakes is we're okay with it rusting in the ground we want those steel stakes to actually rust weld in place but let's get back to the polymeric sand for just a brief second polymeric sand is a sand that instead of just using regular sand it's a two-part sand basically means there's two prop two parts to the process to make it work you put it in place and once you have this sand in place you then wet it down and that activates a polymeric agent which then makes all of the sand adhere together now polymeric sand does have a longer life span but when it fails it's a lot more work to remove it and to replace it and it will fail there is no such thing as no product that never fails so when polymeric sand fails in approximately three to five years you it's a you've got to remove all of these chunks out of it now regular sand you may have to do more you're going to have to do more maintenance with you know typically one to two years you're

Auto-generated from the video audio.