Establish Patio Boundaries and Grade Lines

0:42
15:29
56.8K views

At 0:42 in

Paver patio. Start to Finish with Instructions and Tips

What happens here

The team sets up string lines and spray paint to mark the exact perimeter and contours of the future patio. This step is critical for ensuring the patio's sub-base is properly angled for drainage, rather than being flat, which could lead to water accumulation. A key point is to consider the movement of deck footings separately from the patio to prevent buckling, necessitating a design that allows for independent movement. The sub-base should be sloped away from the house (e.g., 1 inch over 8 feet) to shed water effectively, preventing it from getting trapped underneath the patio. The excavation depth should account for the paver thickness, 1 inch of sand, and 6 inches of base material.

Goal: Define the patio's perimeter and establish precise grade lines to ensure correct pitch and prevent water pooling, especially crucial around existing structures like deck footings.

Tools and materials

  • Level
  • Measuring Tape
  • Shovels
  • Spray Paint (Orange)
  • String Line

What they say

Hide

[Music] this was the like i mean you know it was wet all along here but this is the weapon right like right here probably to the trash bag yeah so maybe once we get everything packed in there and locked in and pitching the right way because this was all going back to the house oh i know yeah next time i want to see you do that line oh son i'll do it right now yeah dead straight so one of the things that we've got to be careful of is that we get the sub base prepped accordingly we don't want the sub base flat we want it angled he followed my line i know it sucks this hill's at an angle or something and that's the soil that goes below the base material that's good that works no it's not it's the outside one beautiful beautiful