Establish Patio Boundaries and Grade Lines
At 0:42 in
Paver patio. Start to Finish with Instructions and Tips
What happens here
The team sets up string lines and spray paint to mark the exact perimeter and contours of the future patio. This step is critical for ensuring the patio's sub-base is properly angled for drainage, rather than being flat, which could lead to water accumulation. A key point is to consider the movement of deck footings separately from the patio to prevent buckling, necessitating a design that allows for independent movement. The sub-base should be sloped away from the house (e.g., 1 inch over 8 feet) to shed water effectively, preventing it from getting trapped underneath the patio. The excavation depth should account for the paver thickness, 1 inch of sand, and 6 inches of base material.
Goal: Define the patio's perimeter and establish precise grade lines to ensure correct pitch and prevent water pooling, especially crucial around existing structures like deck footings.
Tools and materials
- Level
- Measuring Tape
- Shovels
- Spray Paint (Orange)
- String Line
What they say
(734 characters)Hide
What they say
(734 characters)Auto-generated from the video audio.