Prepare Site & Lay First Courses

0:04
7:30
39.3K views

At 0:04 in

One of my Trade secrets to Building difficult retaining walls.

What happens here

Begin by clearing and leveling the area where the new retaining wall will be constructed. The video shows an existing, older retaining wall that will remain in place to provide additional structural support, avoiding disturbance of existing plumbing and electrical lines for a nearby swimming pool. The first few courses of the new retaining wall blocks are carefully laid out along the desired path. At this stage, it's crucial to plan for the drain tile installation, anticipating a drain output every approximately nine blocks to ensure adequate water diversion.

Goal: The initial phase involves preparing the construction site for a new retaining wall, positioned in front of an old, existing wall. The first few courses of the new retaining wall blocks are laid, and the need for a drain tile system behind the wall is established, with placement planned for approximately every nine blocks.

Tools and materials

  • Measuring Tape
  • Retaining Wall Blocks
  • String Line

What they say

Hide

so we're gonna put our next course in get a pin and then we're doing drain tile behind here we'll get that in there he wants six drains through here so it's gonna end up being like one every nine blocks get you caught up to speed we removed an old retaining wall and now we're in the process of building a brand new one in front of the old one so we're borrowing the strength of the old wall because we can't jeopardize any of the plumbing or electrical servicing that swimming pool now let's get on to the next level