Backfill Trench with Gravel and Compact
At 6:08 in
One of my Trade secrets to Building difficult retaining walls.
What happens here
After the drain tile is positioned, the trench is backfilled with clean, coarse gravel. This gravel acts as a permeable backfill, allowing water to percolate through to the drain tile while preventing soil from migrating into the system. A skid steer is used to transport and dump the gravel into the trench, and then a vibratory plate compactor is used to compact the gravel in layers. Proper compaction of the backfill is critical to prevent settlement behind the wall and to maintain the structural integrity of the entire retaining wall system. The process is repeated until the trench is filled to the desired level, typically just below the final grade.
Goal: The trench is backfilled with permeable aggregate (gravel) to allow water to freely reach the drain tile, and then compacted to ensure stability.
Tools and materials
- Skid Steer
- Vibratory Plate Compactor
- Coarse Gravel/Aggregate Unspecified
What they say
(360 characters)Hide
What they say
(360 characters)Auto-generated from the video audio.