Excavate and Grade Trench for Drainage
At 3:40 in
One of my Trade secrets to Building difficult retaining walls.
What happens here
A trench is excavated behind the newly laid retaining wall blocks using a mini-excavator. The trench needs to be wide and deep enough to accommodate the perforated drain tile and a sufficient layer of gravel. A laser level and a grade rod are crucial tools during this phase. One worker operates the mini-excavator, while another uses the grade rod to constantly check the trench's depth and ensure the proper slope for effective water flow. This precision prevents future issues such as standing water or inadequate drainage, which could compromise the retaining wall's stability. If too much soil is removed, it must be carefully backfilled and compacted.
Goal: This step involves using a mini-excavator to dig a trench behind the retaining wall, ensuring the correct depth and slope for the drainage system.
Tools and materials
- Grade Rod
- Laser Level
- Mini-Excavator (Bobcat 325) Bobcat
What they say
(587 characters)Hide
What they say
(587 characters)Auto-generated from the video audio.