Excavate & Grade Drainage Trench
At 3:40 in
One of my Trade secrets to Building difficult retaining walls.
What happens here
Operate a mini excavator (e.g., Bobcat 325) to dig a trench behind the retaining wall. This trench will house the drain tile and drainage aggregate. It is critical to achieve the correct depth and a consistent slope to ensure proper water drainage. Use a grade rod equipped with a laser level receiver, or 'Sam', to constantly check the subgrade. The laser level emits a beam, and the receiver on the grade rod beeps when the desired elevation is reached, guiding the excavator operator ('Blaine') to dig to the precise depth. Adjust the trench depth as needed to account for the gradual slope required for water to drain away effectively.
Goal: Excavate a trench behind the retaining wall where the drainage system will be installed. Use a mini excavator to dig the trench and a grade rod with a laser level receiver to precisely establish and maintain the correct depth and slope (subgrade) for optimal water flow, ensuring water drains away from the wall.
Tools and materials
- Grade Rod with Laser Receiver
- Laser Level
- Mini Excavator (Bobcat 325)
- Shovel
What they say
(871 characters)Hide
What they say
(871 characters)Auto-generated from the video audio.