Skip to main content

Step 9 · Install Top and Bottom Rails

Cut the top and bottom rails to fit between the installed posts. The top rail is typically at a specific height (e.g., 36-42 inches above the deck surface) per code. Secure the rails to the posts using screws or specialized railing connectors. Ensure the top rail is level and the bottom rail is parallel to the deck surface.