Skip to main content

Step 3 · Pour Concrete Footings

Place concrete forms (e.g., Sonotubes) or pour concrete directly into the excavated holes. Ensure the concrete is consolidated to eliminate air pockets. Insert post anchors into the wet concrete at the center of each footing, ensuring they are level and correctly positioned according to the plan. Allow concrete to cure completely.