Skip to main content
Stesso
BrowseFeedExpertsMy Projects
Log inSign up
Stesso

Step 8 · Install Risers and Treads

For each step, first install the riser pavers against the back of the previous tread. Ensure they are plumb and securely set. Then, lay the tread pavers for the current step on top of the sand bed, ensuring they are level and firmly seated. Use construction adhesive to bond risers to treads if desired for extra stability, particularly on steeper slopes.

Stesso home
SearchSearchBrowseBrowseFeedFeedMy ProjectsMy Projects
Log inLog inSign upSign up

Step 8 · Install Risers and Treads

For each step, first install the riser pavers against the back of the previous tread. Ensure they are plumb and securely set. Then, lay the tread pavers for the current step on top of the sand bed, ensuring they are level and firmly seated. Use construction adhesive to bond risers to treads if desired for extra stability, particularly on steeper slopes.

Videos for this step

Lay Step Treads and Continue PaversSecure Step Treads with AdhesiveInstall Pavers for Treads and Landing

Tools and Materials

← Project

How to Build Paver Steps into a Hill

Step 8 of 11·5.5 hr left

Excavate for Step Base
120 minutes5 items
Install Retaining Edge (Optional but Recommended)
90 minutes4 items
Add and Compact Paver Base
180 minutes4 items
Lay Sand Setting Bed
60 minutes3 items
Set First Row of Pavers
90 minutes5 items
Lay Subsequent Rows of Pavers
240 minutes4 items
Cut Pavers for Edges and Risers
120 minutes6 items
8
Install Risers and Treads
180 minutes5 items
9
Sweep Joint Sand
60 minutes3 items
10
Compact Paver Surface
60 minutes2 items
11
Final Joint Sand Application and Cleaning
30 minutes3 items
Prev
Next
TermsPrivacySafetyLegal© 2026 Stesso, Inc.