Step 1 · Excavate for Step Base
Mark the outline of the first step's footprint. Dig down to the required depth, accounting for the thickness of the paver base material (e.g., compacted gravel) and the pavers themselves. The excavated area should be wider than the planned steps to allow for retaining the sides. Ensure the bottom of the excavation is level.
Tools and Materials
PrevNext