Step 6 · Lay Subsequent Rows of Pavers

Lay subsequent rows of pavers, staggering the joints between pavers by at least one-third of a paver's length. This 'running bond' or 'offset' pattern provides structural integrity. Ensure each paver is level and firmly seated in the sand. Check for alignment with the previous row and maintain consistent joint spacing.

Stesso home
SearchSearchBrowseBrowseFeedFeedMy ProjectsMy Projects
Log inLog inSign upSign up

Step 6 · Lay Subsequent Rows of Pavers

Lay subsequent rows of pavers, staggering the joints between pavers by at least one-third of a paver's length. This 'running bond' or 'offset' pattern provides structural integrity. Ensure each paver is level and firmly seated in the sand. Check for alignment with the previous row and maintain consistent joint spacing.

Videos for this step

Lay and Level the PaversLay the First Row of PaversLay Second Row of Pavers and Beyond

Tools and Materials

← Project

How to Build Paver Steps into a Hill

Step 6 of 11·11.5 hr left

Excavate for Step Base
120 minutes5 items
Install Retaining Edge (Optional but Recommended)
90 minutes4 items
Add and Compact Paver Base
180 minutes4 items
Lay Sand Setting Bed
60 minutes3 items
Set First Row of Pavers
90 minutes5 items
6
Lay Subsequent Rows of Pavers
240 minutes4 items
7
Cut Pavers for Edges and Risers
120 minutes6 items
8
Install Risers and Treads
180 minutes5 items
9
Sweep Joint Sand
60 minutes3 items
10
Compact Paver Surface
60 minutes2 items
11
Final Joint Sand Application and Cleaning
30 minutes3 items