Prepare the Site and Lay Base Course
At 0:50 in
Wrapping up a VERY BIG Retaining wall.
What happens here
Begin by rough grading the area where the retaining wall will be constructed, utilizing heavy machinery such as a skid steer (e.g., ASV RT-75) and a mini excavator (e.g., Bobcat 325) to move large quantities of dirt. Once the general area is shaped, a more precise base is created, likely a compacted gravel footing, to ensure a stable and level foundation for the first course of interlocking blocks. Workers then meticulously place the first layer of blocks, ensuring they are level and properly aligned, which is critical for the structural integrity and aesthetics of the entire wall.
Goal: The initial phase involves site preparation, including grading the area with a skid steer and mini excavator to establish the base level for the retaining wall, followed by the precise laying of the first course of interlocking blocks.
Tools and materials
- Compactor (Plate Compactor)
- Interlocking Blocks
- Level
- Mini Excavator
- Rakes
- Shovels
- Skid Steer
- String Line
- Dirt/Soil Unspecified
- Gravel Unspecified