Front Toe-In Compaction & Final Grading
11:09
15:10
87.6K views
At 11:09 in
Wrapping up a VERY BIG Retaining wall.
What happens here
The ground directly in front of the retaining wall's lowest course is filled with earth and compacted to create a robust "toe-in," which is crucial for the wall's overall stability. Simultaneously, the upper terrace area is meticulously fine-graded using a combination of heavy machinery and hand tools. Black dirt (topsoil) is then spread evenly across the surface and smoothed with rakes, creating a pristine and level area ready for seeding grass or installing a paver patio.
Goal: Compact the soil directly at the front base of the retaining wall for a strong toe-in, and then apply final grading with topsoil to the upper terrace to prepare for landscaping.
Tools and materials
- Plate Compactor
- Rakes and Shovels
- Skid Steer Loader
- Topsoil (Black Dirt) Unspecified