Install Drainage & Backfill Lower Courses
At 0:50 in
Wrapping up a VERY BIG Retaining wall.
What happens here
Once the first few courses of interlocking blocks are in place, a layer of geotextile fabric is unrolled and placed against the back of the wall. This fabric prevents soil migration into the drainage layer. A perforated drainage pipe is then laid at the base of the wall, behind the fabric, and covered with clean, coarse drainage gravel. This system is critical for preventing hydrostatic pressure build-up behind the wall. Soil is then added in lifts, behind the gravel, and each layer is thoroughly compacted using a plate compactor and the skid steer's bucket to achieve maximum density and stability.
Goal: After laying the initial blocks, install geotextile fabric and a perforated drainage pipe, then backfill with drainage gravel and compact the material to ensure stability and proper water management behind the wall.
Tools and materials
- Plate Compactor
- Shovels and Rakes
- Skid Steer Loader
- Drainage Gravel (Clean
- Coarse) Unspecified
- Fill Soil Unspecified
- Geotextile Fabric Unspecified
- Perforated Drainage Pipe Unspecified
What they say
(93 characters)Hide
What they say
(93 characters)Auto-generated from the video audio.