Initial Site Prep & Base Course Laying
At 0:00 in
Wrapping up a VERY BIG Retaining wall.
What happens here
The project initiates with significant earthmoving, using a skid steer and excavator to shape the terrain for the large, curved retaining wall. Workers meticulously prepare the foundation by leveling and compacting the ground where the first course of interlocking concrete blocks will be placed. The initial blocks are carefully positioned to establish the precise alignment and elevation of the wall's base.
Goal: Begin the retaining wall construction by preparing the site and laying the first course of interlocking concrete blocks on a leveled, compacted base. This involves moving earth with heavy machinery to create the necessary contours for the wall's foundation.
Tools and materials
- Excavator (Bobcat 325)
- Interlocking Concrete Blocks
- Level
- Plate Compactor
- Rubber Mallet
- Skid Steer Loader (ASV RT-75 Posi-Track)
What they say
(352 characters)Hide
What they say
(352 characters)Auto-generated from the video audio.