Perform Final Grading and Landscaping Prep
At 9:54 in
Wrapping up a VERY BIG Retaining wall.
What happens here
Once the retaining wall is fully constructed and backfilled, the surrounding area requires final grading. This involves spreading an even layer of black dirt or topsoil across the graded surface using the skid steer and hand tools like rakes. This topsoil layer is prepared for subsequent landscaping features, such as a paver patio or seeding for grass. During this phase, it is crucial to ensure a firm and strong 'toe-in' on the bottom side of the retaining wall, especially if it abuts a steep hill, by compacting the soil firmly against the lowest course of blocks. This prevents erosion and enhances the wall's long-term stability.
Goal: Complete the retaining wall project by performing final grading, preparing the soil for future landscaping elements like a paver patio and grass, and ensuring proper toe-in for the wall's stability.
Tools and materials
- Hydro Bucket / Power Grader
- Plate Compactor
- Rakes
- Skid Steer (ASV RT-75)
- Black Dirt / Topsoil Unspecified
What they say
(286 characters)Hide
What they say
(286 characters)Auto-generated from the video audio.