A large wash-out area, approximately three feet deep, is filled using erosion control fabric and backfill. The erosion control fabric is laid out in the hole, and then the mini excavator backfills the area. Since the excavator operator's view is obstructed, a second person guides the backfilling process, communicating when the bucket is correctly positioned to dump the soil. The material is then hand-tamped for compaction.
Goal: A deep wash-out is repaired by lining it with erosion control fabric and then backfilling it with soil. The mini excavator backfills blindly, guided by a spotter, and the soil is compacted by hand-tamping.