Last Minute Emergency- Boulder wall washes out pt#1
Video by Stanley "Dirt Monkey" Genadek
Stanley "Dirt Monkey" Genadek
What happens here
This project involves addressing a washed-out boulder retaining wall, constructing a functional and aesthetically pleasing dry creek bed along a house foundation, and preparing for further landscape renovations including building an access ramp and demolishing a pond. The video showcases the use of heavy machinery for earthmoving, material transportation, and precise installation of landscape elements.
Transcript
(8,522 characters)Hide
Transcript
(8,522 characters)Well, guys. Thank you for coming back today. My name is Stan, "Dirty Monkey", and we have a pretty complex project here with a lot of different elements. We were called because the boulder retaining wall had been eroded. When we arrived at the site, the huge boulders were barely holding onto each other, which could have ended badly if anyone had been nearby in the event of them falling. But that's not all we'll do today. We will also convert an unusable section of this property into a dry creek bed, and then build a ramp through the retaining wall to access the new part of the project. And as if that weren't enough, we're going to tear down the pond and turn it into a patio. So what are we waiting for? Let's start the first part of the work. We started the day well, despite a few minor problems. Well, that's not good. The hydraulics are locked and the Bobcat is not responding. Over here? I know that...It's a small detail. There 's a piece of metal down there. Yes. The guys want to load a mini excavator and a set of crawler tracks onto the trailer—a system for traveling on soft ground—but they have another challenge ahead. Will it start? No, probably not. Volvo doesn't like us. Everyone says bad things about him . Let's see if it starts. Boom, look. This equipment had been sitting there since winter and started right away. A few days ago it wouldn't start. At this new facility, we will have to move across part of the patio. Normally this would require stacking a pile of plywood. I'm not thrilled about this. Lane is not thrilled either. That's why we're bringing...we're bringing tracked trucks. The CAT skid steer loader has already been delivered to the site, so these are the last two items that needed to be brought. Music has captivated me...since childhood. Now she ... Oh, here she is. Somehow Sam makes greasing machinery exciting. Good morning, beautiful. Oh my God. Yes, this is... Look at this blur . Mhm. Wow. This is not a small blur. This is the smallest... it's like there's nothing here at all. Yes, this one, it stretches all the way up the slope. Some sections of the retaining wall were eroded so much that all the soil was washed away, leaving the boulders barely holding onto each other. We need to fill this damn hole. Each washout has its own unique complexities. The guys decide to start with an easier section. The area where the first washout occurred is very cramped, so you'll have to clear the area a bit before you start work . I'll cut it. I'll cut it. The guys discuss the plan and understand how much land they will have to shovel. 4 or 5 inches. From the bottom of the sheathing to the top is about 5-6 inches. This is exactly what we need. Wait, so that's about it ... There's going to be a lot of soil coming out of this. We will continue to move in that direction. This... This will be a good amount of land. Yes. Their first task is to fill this void. Once they do that, they will know where to use the rest of the land. Blaine finally finds a good spot where he can fully deploy the excavator. This is where the fun begins. If it packs the ground too tightly behind the wall, the roots of the plants we want to grow won't be able to penetrate the soil. So you have to compact it exactly as it should be. Too dense— the plants won't grow, and the wall will wash away again within a year. Too weak— the soil won't hold, and the wall will erode before the end of the year. If you do everything right, everything will work harmoniously. But we will have to check this before the work is completed. We have three days of rain ahead of us. When the wall was washed away, a lot of soil fell directly onto the house, and it had to be cleaned up. But the steering on this old Bobcat mini excavator is loose and imprecise, which adds to the hassle. Okay, the first part of this project is complete. We filled the first washout. We raised the level almost 3 feet behind this boulder wall. In short, it was quite blurry here . The first part is ready. We will continue to level the area between the house, garage, and wall. So, let's start, perhaps, from here. There is a pretty steep slope here. This is what collects all their water now. You see where all their water goes. There was a guy here, just to warn you, with a dump truck, trying to work this area. Oh, oh, oh. He was working and just got stuck. So, God. So be careful around the house if it really is that wet here, even though it doesn't feel that way when you're walking and the ground doesn't shake like jelly under your feet. Have you looked at the foundation from the inside? No. It could be smaller. Because if it was already flooded, the foundation could crack. We don't know the condition of the soil and we don't know the condition of the foundation. So we will try to minimize the dynamic load on the foundation of the house. This means we will do everything in a painstaking , monotonous way with a mini excavator, but it is also a safe way. In this area, we are going to create a dry stream bed . Tim calls it a torn stone. There are eight cubes of stone there. But they need to be installed in place, which means they will have to start building a ramp through the retaining wall. I think we can do it. Will it be difficult to get there, here? Yes, I think everything will be fine. I think you should build a ramp here. Yes. So that you can climb up here. Straight up, and then you won't have to turn around. Yes, it's always...it's always risky. They have too much land where the dry riverbed will be , but that doesn't mean it will go to waste. She will go to build a road to access the other side of the house. But the area is too narrow for the CAT to even turn around. Therefore, the Bobcat mini excavator must remove any boulders or obstacles in the way so that the CAT can access the backyard and begin building the ramp. They need decking because the back of the yard can only be accessed through the patio pavers. Then they will have to build a ramp up through the lower retaining wall to drive a CAT loader onto the terrace and finish the job. Although they work on the same plot, the terrace blocks access to the backyard, so they have to take a detour. Reducing the bucket volume means less dirt on the street and more where it belongs. But it also means more round trips. It's a vicious circle. With a fairly steep slope to the right of the car, Sam needs to be very careful when building this ramp. So they make a dry creek bed at the same time as the ramp behind it, using the material from one to build the other. The trench for our dry riverbed is already completed. So we have a gentler downward slope right here where this technique is. And on this side we have a very steep and sharp slope downward. They brought stones to build a dry riverbed, but they also have something that can be reused. Yes, while you take out these stones, I'll spread out the cloth, and by the time you clear the space, we can start pouring? A dense geotextile fabric is laid under the dry bed. To avoid driving on fabric that could tear or shift, they lay out the dry bed in sections. But any stones that have fallen outside the fabric must be removed. After the first layer, they still need to go back and add decorative stones. These are larger stones that will give a natural look, as well as smaller ones to fill in the gaps where the black fabric is visible. The client was unable to grow plants between the wall and the house due to silt, water runoff, and heavy shading. The purpose of this dry riverbed is to make the appearance more attractive, and we want to ensure that, as well as help drain the water. So we want to achieve that too. So, on this side of the house, they'll plant plants, nice ground cover material like hostas and stuff. We're just randomly laying out some rocks here and there along our little stream bed, and we're going to add some small river rocks, scattering them around. We'll do it to add a little authenticity, you know. To vary the sizes of the stones we use. Well, in the next part of the project, we will complete the work on this dry riverbed. We will complete the ramp on top of the retaining wall. We are starting to level the area and will tackle the largest erosion on the construction site. Additionally, we will begin demolishing and cleaning up the pond to turn it into a patio. So be sure to come back, because we'll be showing it soon in future videos. So stay with us. May God protect you . Good luck to you, and we'll see you, probably tomorrow.
Auto-generated from the video audio.