Earthwork and Initial Ramp Construction
10:24
15:17
57K views
At 10:24 in
Last Minute Emergency- Boulder wall washes out pt#1
What happens here
Sam operates the Cat skid loader to continue moving soil and clearing the pathway for the dry creek bed. The existing terrain requires him to operate the machine carefully, especially with a drop-off on one side. This process also involves building a ramp up and over a lower retaining wall to reach the upper terrace. The small bucket loads of dirt minimize spillage on the street, but necessitate more trips back and forth. The mini excavator is used to clear any large rocks or obstructions from the path, allowing the skid loader to move freely.
Goal: Clear the path for the dry creek bed and construct an access ramp to the upper terrace.
Tools and materials
- Bobcat 325 Mini Excavator Bobcat — Clearing large rocks and obstructions from the path
- Cat Skid Loader Caterpillar — Moving dirt and constructing the ramp
- Dirt — Building the ramp and grading
What they say