Material Delivery and Access Ramp Construction
8:09
15:17
57K views
At 8:09 in
Last Minute Emergency- Boulder wall washes out pt#1
What happens here
Eight yards of river rocks are delivered to the site by a dump truck and unloaded in the driveway. These rocks will be used for the dry creek bed. The Cat skid loader is used to transport the rocks from the driveway to the work area. To facilitate access for the skid loader, large wooden 'slat tracks' are laid out as a temporary path over a paved patio area, preventing damage to the existing hardscape.
Goal: Deliver river rocks and create a protected access path for the skid loader.
Tools and materials
- Cat Skid Loader Caterpillar — Transporting rocks from the driveway to the work area
- Dump Truck — Delivering large quantities of river rocks
- Slat Tracks — Creating a temporary access ramp over a paved patio
- River Rocks — Constructing the dry creek bed
What they say
(989 characters)Hide
What they say
(989 characters)Auto-generated from the video audio.