Project Completion and Final Status
13:22
14:41
56.3K views
At 13:22 in
Tough, Tight site
What happens here
The project reaches completion with all excess soil removed from the upper terrace, ensuring water drains away from the house. The dry river bed is finished, and the main wash-out area is filled and graded. The temporary ramp used for access is removed, and final cleanup of rocks and debris from the former pond area is planned.
Goal: The project concludes with successful regrading of the upper terrace for proper drainage, completion of the dry river bed, repair of the wash-out, removal of the access ramp, and preparation for final cleanup.