Backfill Large Washouts
6:28
14:41
56.3K views
At 6:28 in
Tough, Tight site
What happens here
For large, approximately 3-foot deep washouts, begin by lining the excavated area with black landscape fabric to prevent soil erosion through existing boulder walls. Use a mini excavator to carefully backfill the washout with soil. Due to limited visibility from the excavator, a spotter guides the operator. If precision with the skid-steer is difficult, use it to strategically dump soil nearby, allowing the mini excavator to then place the soil accurately into the washout. Finish by hand-tamping the soil for compaction.
Goal: Stabilize and backfill deep washouts by lining them with landscape fabric and filling with soil using heavy machinery and hand tools.
Tools and materials
- Bobcat T325 Mini Excavator
- Hand Tamper
- Skid-Steer Loader (Caterpillar)
- Black Landscape Fabric
- Soil
What they say
(1,800 characters)Hide
What they say
(1,800 characters)Auto-generated from the video audio.