What happens here
Utilize a skid-steer to back up the newly constructed ramp, leveraging its better traction for the steep incline. The skid-steer then dumps loads of river stones into the dry creek bed on the upper terrace. A mini excavator is used to spread these stones, and for any spilled or misplaced stones in tight areas, manual labor is employed to hand-place them, ensuring the dry creek bed is fully covered and aesthetically pleasing.
Goal: Transport and spread river stones using heavy machinery and manual labor to complete the dry creek bed, ensuring thorough coverage and careful placement.
Tools and materials
- Bobcat T325 Mini Excavator
- Gloves
- Skid-Steer Loader (Caterpillar)
- Small River Stones