Inspect Completed Foundation and Plan for Framing
At 9:11 in
There’s Not Enough Room For This Build
What happens here
After the concrete work is completed, the presenter showcases the finished footings and stem walls of the cabin foundation. He highlights the black waterproofing applied to the exterior of the stem walls, which will be buried. This waterproofing acts as a barrier against moisture and frost, protecting the concrete. He explains that the backfilling of soil against these waterproofed walls will prevent moisture intrusion and frost damage, crucial for the longevity of the foundation. The presenter then discusses the next major step: framing the entire structure, expressing excitement for the project's increasing scale.
Goal: Review the completed concrete foundation and prepare for the framing stage.
Tools and materials
- Waterproofing Tar/Membrane — Protecting the buried stem walls from moisture
What they say