Unload Materials and Prepare Site
0:00
12:44
78.1K views
At 0:00 in
Start to Finish Rebuild -Done
What happens here
Utilize a skid steer equipped with fork attachments to carefully unload pallets of pavers and bags of base material from delivery trailers. Position materials strategically around the work site for easy access, while also rough grading the existing sub-base to establish the overall footprint and initial slopes for drainage.
Goal: Begin by safely unloading all necessary materials, primarily pallets of pavers and base aggregates, using heavy machinery. Simultaneously, ensure the sub-base is roughly leveled and ready for the next stages of aggregate application.
Tools and materials
- Skid Steer with Forks Caterpillar
- Concrete Pavers (palletized) Unspecified