Final Grading, Landscaping, and Watering
At 9:55 in
Start to Finish Rebuild -Done
What happens here
Use heavy equipment like a mini-excavator and skid steer to perform final grading around the patio, creating proper slopes for drainage and integrating the patio with the existing landscape. Place decorative rocks or mulch around the patio perimeter as part of the landscaping. Once all dry polymeric sand has been swept into the joints and excess removed, gently mist the entire paver surface with water using a hose with a fine spray nozzle. This activates the polymers in the sand, causing it to harden and lock the pavers together. Be careful not to wash away the sand from the joints. Write the date on a hidden paver as a timestamp for the project completion.
Goal: Complete the surrounding landscaping and gently water the patio surface to activate the polymeric sand, creating a durable and finished outdoor space.
Tools and materials
- Marker (oil-based) Milwaukee Inkzall
- Mini Excavator Bobcat 325
- Skid Steer ASV RT-75
- Decorative Rocks Unspecified
- Mulch Unspecified
What they say
(1,493 characters)Hide
What they say
(1,493 characters)Auto-generated from the video audio.